faq banner
 
 
Online Tools
Select State (*)
Select Topic
Enter Keyword
 
 
FAQ for Pre Order, West
Keyword:  Network,Modifications
13 Results        1-10  Next
- How does the CLEC obtain the engineering analysis?
- Who is eligible for a Network Loop Modification?
- What charges will the CLEC incur for Network Loop Modifications?
- Who should the CLEC contact if it has questions about the SUP 7?
- If a CLEC agrees to Verizon's terms, conditions, and rates for Network Loop Modifications, how does the CLEC obtain such modifications?
- After the CLEC has received their alpha identifiers, what is the next step?
- How does the CLEC request a cost estimate for any required Engineering and Construction?
- Who does the CLEC contact if the SUP 6 response is not received within 72 hours?
- If a CLEC wishes to cancel a request upon receiving the cost estimate, how may it do so?
- What are Network Loop Modifications?
13 Results       1-10  Next
View All: